Oil & Gas
Production industry includes process upstream
products for treatment, separation, dehydration,
absorption, and desulfurization to crude petroleum
or natural gas prior to transportation to downstream
facilities, such as storage terminals, and refineries.
These facilities include the normal production
of oil and gas, as well as Enhanced Oil Recovery
(EOR) operations, Water Alternating Gas (WAG),
flood, CO2 injection, Steam Assisted Gravity Drainage
(SAGD) oil sands extraction and thermal (firewater)
extraction technology.
| YEAR |
PROJECT |
DESCRIPTION |
CLIENT |
| 2008 |
Shell Scotford Upgrader
Expansion 1 |
Fabricate of 500,000
dia. inches of Carbon, SS & Alloy Piping |
Bechtel Canada/
Shell |
| 2006 |
Long Lake Upgrader
Project |
Carbon Steel Pipe
Fabrication |
OPTI Nexen |
| 2005 |
Saiwoo - Sable Tier
II Compression Platform |
Onshore Piperack
Module Fabrication |
AMEC Black &
MacDonald |
| 2005 |
Long Lake Upgrader Project |
Crude Silo Fab Piping &
Assemble Modules |
OPTI Nexen |
| 2003 |
White
Rose Offshore Oil |
MO-1 Duplex Headers
MO-2 Pipe Fab
|
Aker Maritime Kiewit Contractors
Husky Energy |
| 2003 |
Syncrude
UE-1 |
Carbon & Stainless Steel
Fabrication |
Syncrude |
| 2001 |
ACJV – Shell Oil
Athabasca
Oil Sands Downstream
|
Pipe & Supports Fabrication |
Fluor Daniel
Colt Engineering |
| 2001 |
ACJV – Shell Oil Athabasca
Oil Sands Downstream |
Pipe & Supports Fabrication |
Bantrel |
| 2001 |
ACJV – Shell Oil Athabasca
Oil Sands Downstream |
Pipe & Supports Fabrication |
Parsons
Tri-Ocean |
| 1999 |
Suncor
Millennium |
Pipe Fabrication |
Bantrel/Fluor
Suncor Energy |
| 1999 |
Suncor
Millennium |
Modular Fabrication |
Bantrel/Fluor
Suncor Energy |